Solar and roofs in Buckeye
Solar panel removal and reinstall in Buckeye, AZ is part of a growing share of roofing jobs, because rooftop solar is common across the Valley and the roofs it sits on are reaching replacement age. A tile roof built in the 2000s may carry an array installed years later, over felt that is now at the end of its published 15 to 20 year Arizona life.
When that felt needs replacing, the panels have to come off. Done well, that is an opportunity: every racking attachment, which is a common source of leaks on tile roofs, gets a new flashing set properly into the new underlayment. Done badly, the panels go back on the same old penetrations and the leaks return.

Why mounts leak on tile roofs
Solar mounts leak on tile roofs for three reasons, and all three are fixed during a proper detach and reset.
Sealed instead of flashed
A mount that relies on sealant around the penetration depends on that sealant surviving years of roof surfaces that can pass 160 degrees. A flashing that laps into the underlayment sheds water mechanically and does not depend on a bead of mastic.
Cracked tile from installation
Installers walking the tile to set the array can crack pieces that then sit hidden under the panels for years.
Aged felt
Even a perfectly flashed mount relies on the felt around it. Once that felt has aged out, water that gets under the tile anywhere near the array has nowhere to go but in.
| Situation | Better plan |
|---|---|
| Planning solar on an older tile roof | Inspect the felt first; re-felt before the array goes on if it is near the end of its life |
| Existing solar, roof needs re-felt or replacement | Detach and reset combined with the roof job, new flashings at every mount |
| Existing solar, one leak at a mount | Targeted repair: lift the array section, reflash the mount, check the felt |
| New roof just completed | Install solar with flashings into the new underlayment, and photograph the roof before the crew goes up |

Coordinating the roofer and the solar company
A detach and reset involves two trades: the electrical work of disconnecting and reconnecting the system, and the roofing work of flashing the attachments into the new roof. The smoothest jobs are scheduled together, with one plan for where the attachments go back.
- Check your solar warranties for who is allowed to remove and reinstall the array
- Agree in writing who disconnects, who stores, who reattaches and who flashes
- Ask for the attachments to be reflashed into the new underlayment, not resealed
- Photograph the array and roof before work starts
- Confirm the system is tested and producing after reconnection
See tile underlayment replacement, roof replacement, the service area, or request a quote.
How a re-felt with solar is sequenced
On a Buckeye tile roof, the most common solar-related roofing job is an underlayment replacement on a roof that already carries an array. The sequence is what keeps it clean.
| Stage | Who | What happens |
|---|---|---|
| 1. Pre-job walk | Roofer and solar or electrical contractor | Array, attachments and roof condition reviewed and photographed |
| 2. Shutdown and removal | Solar or electrical contractor | System shut down safely, panels and racking removed and stored on site |
| 3. Tile and felt | Roofer | Tile lifted, old felt removed, deck repaired, new underlayment and flashings installed |
| 4. Attachment points | Roofer | New mounts set and flashed into the new underlayment at the planned positions |
| 5. Tile relaid | Roofer | Tile relaid around the new mounts, ridges fastened |
| 6. Array reinstalled | Solar or electrical contractor | Racking and panels remounted, system reconnected and tested |
Agreeing who does each stage, in writing, before the job starts prevents the most common problem: the solar crew and the roofing crew each assuming the other is handling the flashings.
Before adding new solar to a tile roof
If you are planning solar on a Buckeye home with an older tile roof, the roof should be checked first. A simple question decides it: how much life does the felt under the tile have left?
- Have a roofer lift tiles where the array will go and check the felt
- If the felt is near the end of its published 15 to 20 year life, re-felt that area or the whole roof first
- Photograph the roof before the solar crew goes up
- Ask the solar company how each attachment will be flashed into the underlayment
- Ask how the crew will walk the tile to avoid cracking it
- Keep the roofing and solar warranties together
Ground-mounted arrays on acreage
On larger parcels around Tonopah, Palo Verde and Arlington, ground-mounted arrays avoid roof penetrations altogether. Maricopa County distinguishes roof-mounted and ground-mounted photovoltaic permits for unincorporated properties. If you are on acreage and planning solar, it is worth weighing a ground mount before putting an array on a roof that will need work in a few years. See roofing in Tonopah.
Mounts and flashing on tile roofs

On a tile roof, solar racking attaches to the rafters through the tile and the underlayment. The tile at each mount is cut, replaced with a flashed mount tile, or worked around with a hook that passes between courses, and a flashing is set under the tile into the underlayment so water that gets under the tile is turned away from the fastener.
During a re-felt, each of those points is rebuilt with the new underlayment, which is the main reason a detach and reset done alongside the roof work leaves the roof better than it found it.
How a solar detach and reset runs
- Inspect the roof and the array. The roofer and the solar or electrical contractor look at the roof condition, the array layout and every attachment point before anything is removed.
- Safe disconnect. The system is shut down and disconnected by someone qualified for the electrical work.
- Detach and store. Panels and racking come off and are stored on site, with hardware labelled to its position.
- Roof work. The re-roof or underlayment replacement is completed, with new flashed attachment points planned for the racking.
- Reinstall with new flashings. Racking is reattached through new flashings set into the new underlayment, panels are remounted, and the system is reconnected and tested.